Timetable alterations, Saturday 3rd August to Wednesday 7th August

TPE will be operating an emergency timetable from Saturday 3rd August at least until Monday 5th August, potentially longer.

Because of the Whaley Bridge/Toddbrook Dam situation, the line between Manchester and Sheffield is closed. In order to provide a replacement service between Manchester and Sheffield, TPE will be extending the Manchester to Huddersfield stopping service to/from Sheffield.

Sheffield to Manchester every hour (xx:11), calling Meadowhall, Huddersfield, Slaithwaite, Marsden, Greenfield, Stalybridge and Manchester Piccadilly.
Manchester to Sheffield every hour (xx:17), calling at Stalybridge, Greenfield, Marsden, Slaithwaite, Huddersfield and Sheffield.

Whilst timings between Huddersfield and Manchester should be unaltered, expect the trains to be a lot busier than usual.

UPDATE 4/08/2019. It all seems a bit pointless, given that TPE, National Rail Enquiries, etc are not telling people about the Sheffield to Manchester via Huddersfield service. The advice being given is either not to travel, or to travel via Leeds. So however well-intentioned this is, the only practical effect is to make the Huddersfield to Manchester stopping service more prone to cancellations.

SECOND UPDATE 6/08/2019. The information being given out by TPE & Nantional Rail Enquiries was belatedly changed, sometime on 5/08/2019, so as to tell passengers about the Sheffield to Manchester via Huddersfield service. The Sheffield to Manchester route will reopen on Wednesday 7/08/2019.

Posted in timetable changes | Tagged | Leave a comment

Proposed Timetable Changes for December 2019

Summary of the changes that will take place at May 2019 and the proposed changes for December 2019.

TPEs priority for May 2019 is to build on the improvements made in the December 2018 timetable change, protecting performance improvements and reliability of service.  They will be extending the train turnarounds at Scarborough and Newcastle which will provide more resilience in the timetable; this was done at Manchester Airport in the December 2018 timetable change with major performance improvements achieved as a result. 

To protect the provision of existing services, and in line with a request from Rail North Committee that performance/reliability is protected in the first instance rather than additional/new services introduced, TPE are deferring the start of the direct Liverpool Lime Street to Glasgow Central service via the West Coast Main Line until this Autumn.  These changes took place from Sunday 19th May.

For the December 2019 timetable change, TPE have submitted the following changes to Network Rail:-

  • half hourly [stopping service] in the am/pm peak between Manchester and Huddersfield
  • extension of Liverpool Lime Street – Newcastle service to Edinburgh Waverley, with all call at Morpeth (Huddersfield will be directly connected to Morpeth and Edinburgh)
  • removal of some calls in the off-peak from the Hull – Manchester Piccadilly service
  • extension of the Manchester Airport – Middlesbrough service to Redcar

These bids are currently being evaluated by Network Rail, with a formal outcome due by early summer. 

Posted in Marsden, Slaithwaite, timetable changes, Transpennine Express | Tagged , , , | Leave a comment

“Turning Pacer trains into village halls? Send them down south instead”

[from Helen Pidd, The Guardian, Wed 29 May 2019]

Turning Pacer trains into village halls? Send them down south instead

Plans to repurpose these rusty old trains isn’t even a bad joke. Where’s the focus on decent rail services in northern England?

It was one of those press releases so silly I had check I wasn’t about to fall for some ridiculous prank: could the department for transport (DfT) really be heralding an “exciting” new plan to offer northern towns the chance to bid for a knackered old Pacer train to turn into “a community space, cafe or new village hall”?

I refreshed my browser, checked the URL didn’t include the second level domain joke.uk, and gasped. It was real. Rail minister Andrew Jones really had said:

“Through this competition we can ensure that the Pacer can be transformed to serve a community near where it carried passengers in an entirely different way. What we need now are creative and exciting proposals from the public, alongside ideas from businesses keen to support this competition, as we say goodbye to Pacers on our railway.”

Jones, whose government has cut council budgets so dramatically that they will have lost almost 60p in the £1 for local services in the decade to 2020, was actually suggesting that community spaces shuttered as a result of his administration’s austerity drive be replaced by train carriages with toilets less modern than many at Glastonbury.

A government not so much tin-eared as deaf, blind and so out of touch with northern England that it tried to sell this insulting, laughable idea as something so thrilling that we would actually compete for rusty old trains long abandoned by Iran as too antiquated. Perhaps the civil servant who came up with it could totally see hipsters in Hackney turning them into bars serving cocktails out of old British Rail mugs with ironic names such as Pacer Colada or Screwdriver (Anyone? Train’s Broken Down). As Wigan MP Lisa Nandy put it: “If this is the ‘northern powerhouse’ they can keep it.”

As a very regular rail passenger in the north of England, I often have the extreme displeasure of travelling on Pacer trains. Famously cobbled together on the cheap, using the shell of a Leyland bus welded to a freight wagon frame, they went out of service in the south-east of England many years ago, but the government has allowed successive private rail companies to keep them rumbling on in the north. Never mind the fact that the doors jam, the roofs leak and the windows won’t close (you’ll have to keep your coat on and hood up in your new village hall).I took one with my 10-year-old stepdaughter a few weeks ago. She lives in the Midlands, where Pacers went out of fashion before she was born, and wanted to know why the bench seats had no headrests and were all facing one direction like on a bus. Why are the brakes screeching like that? (“Flange squeal” on tight corners caused by the long wheelbase and lack of ride-smoothing bogies: themselves a modern luxury invented in 1874) If you flush the toilet does it really all end up on the track? (Yes) Why aren’t there any tables? (We northerners do not deserve such opulence) Can I plug in my iPod Touch? (dream on, honeybun).

Pacers were supposed to be phased out as part of the Northern rail franchise, which is so badly run that the mayors of Greater Manchester and Liverpool city region on Wednesday called for it to be taken under government control.

The National Railway Museum in York was hoping to put a Pacer on display in its history section this year but had to postpone the exhibition after Northern admitted it still needed them in service.

Jonathan Reynolds, MP for Stalybridge and Hyde in Greater Manchester, couldn’t see his constituents bidding for a Pacer cafe or playgroup.

“I am not sure my constituents will agree that this is an ‘exciting opportunity’, unless one of them is turned into a museum dedicated to highlighting years of under-investment in northern transport,” he told the Manchester Evening News. “My personal suggestion would be to invite my fed up constituents to dismantle them piece by piece, a bit like when the Berlin Wall came down.”

There may come a time in the distant future – when a new high-speed rail line in the north from east to west has been built and it no longer takes almost three hours, one change and a fair wind to get from Liverpool to Hull – when we are ready to enjoy Pacers ironically. But not yet.

• Helen Pidd is the Guardian’s north of England editor

https://www.theguardian.com/commentisfree/2019/may/29/pacer-trains-village-halls-send-down-south

Posted in Uncategorized | Leave a comment

“Manchester and Liverpool mayors call for termination of Northern rail franchise”

[from The Guardian, Wed 29 May 2019] 

 “Manchester and Liverpool mayors call for termination of Northern rail franchise”

Andy Burnham and Steve Rotheram urge transport secretary to take action after year of misery

The mayors of Greater Manchester and Liverpool city region have called on the transport secretary to terminate the Northern rail franchise after a year of sustained misery for passengers.

Manchester’s mayor, Andy Burnham, and Liverpool’s Steve Rotheram, speaking on behalf of the 4.3 million people they represent, made the demand 12 months on from last May’s rail timetable chaos.

They believe Northern – which is owned by Deutsche Bahn, the German state railway – has consistently failed to show it was able to take the action required to restore public confidence or deliver its legally-binding franchise requirements. These include:

  • Failure to deliver a significant and sustained improvement in performance, with nearly a fifth of all services arriving late; 28,000 services cancelled in the last year; and a huge increase in services being “shortformed” (reducing the number of carriages on the train) from 2,825 in December 2018 to 4,172 in April 2019.
  • Failure to resolve the RMT industrial dispute, which has led to 46 days of strike action since March 2017.
  • Failure to operate Sunday services: last Sunday alone there were 165 unplanned cancellations on top of 90 planned cancellations.
  • Failure to deliver new services, such as a range of promised additional hourly services in much-needed parts of the network.
  • Failure to introduce new trains, which means the hated Pacer trains may not be gone by the end of the year as promised.

On Tuesday the government announced an “exciting” competition, which invites northern towns and villages to bid for Pacer trains to be turned into “community spaces, cafes or new village halls”.

The proposal was greeted with incredulity by northern MPs, after nine years of austerity cuts from central government in which councils have lost almost 60p in the £1 from Whitehall for local services in the decade to 2020, with northern authorities worst hit.

“I am not sure my constituents will agree that this is an ‘exciting opportunity’, unless one of them is turned into a museum dedicated to highlighting years of under-investment in Northern transport,”

the Stalybridge & Hyde MP Jonathan Reynolds told the Manchester Evening News.

“My personal suggestion would be to invite my fed up constituents to dismantle them piece-by-piece, a bit like when the Berlin Wall came down.”

The Greater Manchester and Liverpool city region mayors are now urging the department for transport to implement an “Operator of Last Resort” and bring in a new board and team of directors to run the company as soon possible.

Ministers should keep all options on the table, including further devolution to the north and the option of public operation.

Last year Chris Grayling, the transport secretary, terminated Virgin Trains East Coast’s contract and took the service in-house.

The Northern franchise is supposed to last until 2025, with an option for an additional year which is dependent on performance.

https://www.theguardian.com/uk-news/2019/may/29/manchester-and-liverpool-mayors-call-for-termination-of-northern-rail-franchise

Posted in Northern Rail | Tagged | Leave a comment