{"id":2791,"date":"2026-11-19T14:02:43","date_gmt":"2026-11-19T14:02:43","guid":{"rendered":"https:\/\/www.smart-rail.co.uk\/?p=2791"},"modified":"2026-11-19T17:22:54","modified_gmt":"2026-11-19T17:22:54","slug":"station-usage-figures-for-marsden-slaithwaite-2025-26","status":"publish","type":"post","link":"https:\/\/www.smart-rail.co.uk\/?p=2791","title":{"rendered":"Station Usage Figures for Marsden &amp; Slaithwaite, 2025-26"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">Station footfall data for the period April 2025 to March 2026 was published on 19<sup>th<\/sup> November at&nbsp; https:\/\/dataportal.orr.gov.uk\/media\/pwshvlbd\/station-usage-2025-26-statistical-release.pdf <\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Passenger usage figures for Marsden and Slaithwaite are up by 9% and unchanged respectively since last year.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"518\" src=\"https:\/\/www.smart-rail.co.uk\/wp-content\/uploads\/2026\/11\/Picture2-1024x518.jpg\" alt=\"\" class=\"wp-image-2792\" srcset=\"https:\/\/www.smart-rail.co.uk\/wp-content\/uploads\/2026\/11\/Picture2-1024x518.jpg 1024w, https:\/\/www.smart-rail.co.uk\/wp-content\/uploads\/2026\/11\/Picture2-300x152.jpg 300w, https:\/\/www.smart-rail.co.uk\/wp-content\/uploads\/2026\/11\/Picture2-768x388.jpg 768w, https:\/\/www.smart-rail.co.uk\/wp-content\/uploads\/2026\/11\/Picture2-1536x777.jpg 1536w, https:\/\/www.smart-rail.co.uk\/wp-content\/uploads\/2026\/11\/Picture2-2048x1036.jpg 2048w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">Marsden&#8217;s 2025-26 figure of 240,494 passenger journeys is the highest since records were published.<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td>&nbsp;<\/td><td>2024-25<\/td><td>2025-26<\/td><td>% change<\/td><\/tr><tr><td><strong>Marsden<\/strong><\/td><td>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; 220,584<\/td><td>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; 240,494<\/td><td>9.0%<\/td><\/tr><tr><td><strong>Slaithwaite<\/strong><\/td><td>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; 235,294<\/td><td>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; 235,182<\/td><td>0.0%<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">SMART&#8217;s view is that this level of passenger usage continues to amply justify our aspiration for two stopping trains per hour throughout the day.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Passenger figures have held up remarkably well even with the period including a 30-day closure of Huddersfield station resulting in an additional months\u2019 worth of bus replacement.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">In 2024\/25 Slaithwaite station saw 32 days of bus replacement, and Marsden 16 days of bus replacement. In 2025\/26 this increased to 64 days of bus replacement for both Slaithwaite &amp; Marsden.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">In 2026\/27, subject to not being 100% sure about any closures in February and March, Slaithwaite &amp; Marsden will have experienced 86 &amp; 71 days of bus replacement respectively.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">For comparison, the figures and percentage changes for some other local stations, including Deighton &amp; Ravensthorpe (both closed for rebuilding, with bus replacement throughout the year) are below.<\/p>\n\n\n\n<figure class=\"wp-block-table alignright\"><table><tbody><tr><td>&nbsp;<\/td><td>2024-25<\/td><td>2025-26<\/td><td>% change<\/td><\/tr><tr><td><strong>Stalybridge<\/strong><\/td><td>840,136<\/td><td>928,986<\/td><td>11%<\/td><\/tr><tr><td><strong>Stalybridge (interchanges)<\/strong><\/td><td>54,422<\/td><td>70,133<\/td><td>29%<\/td><\/tr><tr><td><strong>Stalybridge (including interchanges)<\/strong><\/td><td>894,558<\/td><td>999,119<\/td><td>12%<\/td><\/tr><tr><td><strong>Mossley<\/strong><\/td><td>260,288<\/td><td>243,076<\/td><td>-6.6%<\/td><\/tr><tr><td><strong>Greenfield<\/strong><\/td><td>350,528<\/td><td>342,440<\/td><td>-2.3%<\/td><\/tr><tr><td><strong>Huddersfield<\/strong><\/td><td>3,136,040<\/td><td>2,852,624<\/td><td>-9%<\/td><\/tr><tr><td><strong>Huddersfield (interchanges)<\/strong><\/td><td>751,429<\/td><td>404,151<\/td><td>-46%<\/td><\/tr><tr><td><strong>Huddersfield (including interchanges)<\/strong><\/td><td>3,887,469<\/td><td>3,256,775<\/td><td>-16%<\/td><\/tr><tr><td><strong>Deighton<\/strong><\/td><td>63,430<\/td><td>43,482<\/td><td>-31%<\/td><\/tr><tr><td><strong>Ravensthorpe<\/strong><\/td><td>31,442<\/td><td>21,774<\/td><td>-31%<\/td><\/tr><tr><td><strong>Brighouse<\/strong><\/td><td>387,592<\/td><td>465,532<\/td><td>20%<\/td><\/tr><tr><td><strong>Brighouse (interchanges)<\/strong><\/td><td>36,630<\/td><td>114,849<\/td><td>214%<\/td><\/tr><tr><td><strong>Brighouse (including interchanges)<\/strong><\/td><td>424,222<\/td><td>580,381<\/td><td>37%<\/td><\/tr><\/tbody><\/table><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>Station footfall data for the period April 2025 to March 2026 was published on 19th November at&nbsp; https:\/\/dataportal.orr.gov.uk\/media\/pwshvlbd\/station-usage-2025-26-statistical-release.pdf Passenger usage figures for Marsden and Slaithwaite are up by 9% and unchanged respectively since last year. Marsden&#8217;s 2025-26 figure of 240,494 &hellip; <a href=\"https:\/\/www.smart-rail.co.uk\/?p=2791\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[59,58],"tags":[8,32],"class_list":["post-2791","post","type-post","status-publish","format-standard","hentry","category-marsden","category-slaithwaite","tag-marsden","tag-slaithwaite"],"_links":{"self":[{"href":"https:\/\/www.smart-rail.co.uk\/index.php?rest_route=\/wp\/v2\/posts\/2791","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.smart-rail.co.uk\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.smart-rail.co.uk\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.smart-rail.co.uk\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.smart-rail.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=2791"}],"version-history":[{"count":4,"href":"https:\/\/www.smart-rail.co.uk\/index.php?rest_route=\/wp\/v2\/posts\/2791\/revisions"}],"predecessor-version":[{"id":2796,"href":"https:\/\/www.smart-rail.co.uk\/index.php?rest_route=\/wp\/v2\/posts\/2791\/revisions\/2796"}],"wp:attachment":[{"href":"https:\/\/www.smart-rail.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=2791"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.smart-rail.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=2791"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.smart-rail.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=2791"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}