{"id":270,"date":"2010-06-06T17:02:25","date_gmt":"2010-06-06T16:02:25","guid":{"rendered":"http:\/\/smart-rail.co.uk\/?p=270"},"modified":"2011-06-23T09:25:05","modified_gmt":"2011-06-23T08:25:05","slug":"smart-still-campaigns-for-a-better-service","status":"publish","type":"post","link":"https:\/\/www.smart-rail.co.uk\/?p=270","title":{"rendered":"Smart still campaigns for a better service"},"content":{"rendered":"<p class=\"MsoNormal\"><strong style=\"mso-bidi-font-weight: normal;\"><span lang=\"EN-GB\">For those unable to get hold of a copy of the Huddersfield Examiner article on June 3rd, here follows a copy of that article.<\/span><\/strong><\/p>\n<p class=\"MsoNormal\">\n<p class=\"MsoNormal\">\n<p class=\"MsoNormal\"><strong style=\"mso-bidi-font-weight: normal;\"><span lang=\"EN-GB\">Passengers demand improvements at Slaithwaite and Marsden stations <\/span><\/strong><\/p>\n<p class=\"MsoNormal\"><span lang=\"EN-GB\"> <\/span><\/p>\n<p class=\"MsoNormal\"><span lang=\"EN-GB\">Jun  3 2010<\/span><span lang=\"EN-GB\"> by Joanne Douglas, <\/span><span lang=\"EN-GB\">Huddersfield<\/span><span lang=\"EN-GB\"> Daily Examiner <\/span><\/p>\n<p class=\"MsoNormal\"><span lang=\"EN-GB\"> <\/span><\/p>\n<p class=\"MsoNormal\"><span lang=\"EN-GB\">DIRTY trains and a PA system which broke after three days are just two of the complaints about Slaithwaite station from a local travel action group.<\/span><\/p>\n<p class=\"MsoNormal\"><span lang=\"EN-GB\"> <\/span><\/p>\n<p class=\"MsoNormal\"><span lang=\"EN-GB\">And now Slaithwaite and Marsden Action on Rail Transport (SMART) are demanding answers.<\/span><\/p>\n<p class=\"MsoNormal\"><span lang=\"EN-GB\"> <\/span><\/p>\n<p class=\"MsoNormal\"><span lang=\"EN-GB\">Tony Bowers said the PA system, installed on May 19 after a nine month absence had broken down just three days later.<\/span><\/p>\n<p class=\"MsoNormal\"><span lang=\"EN-GB\"> <\/span><\/p>\n<p class=\"MsoNormal\"><span lang=\"EN-GB\">He said improvements on the <\/span><span lang=\"EN-GB\">Huddersfield<\/span><span lang=\"EN-GB\"> to <\/span><span lang=\"EN-GB\">Manchester<\/span><span lang=\"EN-GB\"> <\/span><span lang=\"EN-GB\">Victoria<\/span><span lang=\"EN-GB\"> service were needed urgently.<\/span><\/p>\n<p class=\"MsoNormal\"><span lang=\"EN-GB\"> <\/span><\/p>\n<p class=\"MsoNormal\"><span lang=\"EN-GB\">SMART are calling on Northern Rail to get moving on improving the station\u2019s facilities for passengers.<\/span><\/p>\n<p class=\"MsoNormal\"><span lang=\"EN-GB\"> <\/span><\/p>\n<p class=\"MsoNormal\"><span lang=\"EN-GB\">Mr Bowers, of Slaithwaite, said: \u201cIt is significant that Northern Rail has, after an interval of some nine months, finally restored the PA system for passengers travelling from Marsden and Slaithwaite.<\/span><\/p>\n<p class=\"MsoNormal\"><span lang=\"EN-GB\"> <\/span><\/p>\n<p class=\"MsoNormal\"><span lang=\"EN-GB\">\u201cThe reconnection of the information tannoy on May 19 is to be welcomed, but the public announcement system only lasted three days. It had failed again by Saturday.\u201d<\/span><\/p>\n<p class=\"MsoNormal\"><span lang=\"EN-GB\"> <\/span><\/p>\n<p class=\"MsoNormal\"><span lang=\"EN-GB\">He said the nine-month wait for passengers raised serious questions about the capacity of Northern Rail to fulfil its responsibilities of providing a service to the public. Last month the company won a two-year extension to its franchise to continue running after next September.<\/span><\/p>\n<p class=\"MsoNormal\"><span lang=\"EN-GB\"> <\/span><\/p>\n<p class=\"MsoNormal\"><span lang=\"EN-GB\">Mr Bowers added: \u201cThis information system is of considerable importance, not least because Northern Rail now appears to be cancelling regular weekday trains \u2013 currently those outside rush hour. \u201cIt is our experience that during the entire period of Northern franchise, not only have passengers been promised new rolling stock, but those travelling from Slaithwaite and Marsden have had to suffer the most broken down, ruined, leaking and dirty stock in the country.\u201d<\/span><\/p>\n<p class=\"MsoNormal\"><span lang=\"EN-GB\"> <\/span><\/p>\n<p class=\"MsoNormal\"><span lang=\"EN-GB\">He said it was \u201cfrustrating\u201d for people to be left waiting on the platform for a train that had been cancelled, but with no information telling them.<\/span><\/p>\n<p class=\"MsoNormal\"><span lang=\"EN-GB\"> <\/span><\/p>\n<p class=\"MsoNormal\"><span lang=\"EN-GB\">\u201cWe were told to call the train operator on our mobiles, but that\u2019s a few minutes on a phone waiting to speak to someone \u2013 it\u2019s not acceptable,\u201d he said.<\/span><\/p>\n<p class=\"MsoNormal\"><span lang=\"EN-GB\"> <\/span><\/p>\n<p class=\"MsoNormal\"><span lang=\"EN-GB\">\u201cWhen it\u2019s an hourly service and people depend on it to get to work, not to be told if the train is coming or not, is frustrating.\u201d<\/span><\/p>\n<p class=\"MsoNormal\"><span lang=\"EN-GB\"> <\/span><\/p>\n<p class=\"MsoNormal\"><span lang=\"EN-GB\">And he said the facilities on the <\/span><span lang=\"EN-GB\">West Yorkshire<\/span><span lang=\"EN-GB\"> side of the service were poor in comparison to those in Greater Manchester, where there are platform ticket facilities and up-to-date display boards with information at stations.<\/span><\/p>\n<p class=\"MsoNormal\"><span lang=\"EN-GB\"> <\/span><\/p>\n<p class=\"MsoNormal\"><span lang=\"EN-GB\">Northern Rail secured a new deal after improving the punctuality of its services from 84%, when it took on the franchise in 2004, to 92% last year.<\/span><\/p>\n<p class=\"MsoNormal\"><span lang=\"EN-GB\"> <\/span><\/p>\n<p class=\"MsoNormal\"><span lang=\"EN-GB\">They say they have \u00a3100m for more and newer trains and to improve facilities at stations.<\/span><\/p>\n<p class=\"MsoNormal\"><span lang=\"EN-GB\"> <\/span><\/p>\n<p class=\"MsoNormal\"><span lang=\"EN-GB\">A spokeswoman for Northern Rail said: \u201cWe are aware of the ongoing problems with the PA system at Slaithwaite station and apologise for the inconvenience this is causing to our passengers.<\/span><\/p>\n<p class=\"MsoNormal\"><span lang=\"EN-GB\"> <\/span><\/p>\n<p class=\"MsoNormal\"><span lang=\"EN-GB\">\u201cWe have repaired the system several times and are investigating longer term solutions to provide consistent information to passengers.\u201d<\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>For those unable to get hold of a copy of the Huddersfield Examiner article on June 3rd, here follows a copy of that article. Passengers demand improvements at Slaithwaite and Marsden stations Jun 3 2010 by Joanne Douglas, Huddersfield Daily &hellip; <a href=\"https:\/\/www.smart-rail.co.uk\/?p=270\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[5],"tags":[8,32],"class_list":["post-270","post","type-post","status-publish","format-standard","hentry","category-northern-rail","tag-marsden","tag-slaithwaite"],"_links":{"self":[{"href":"https:\/\/www.smart-rail.co.uk\/index.php?rest_route=\/wp\/v2\/posts\/270","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.smart-rail.co.uk\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.smart-rail.co.uk\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.smart-rail.co.uk\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.smart-rail.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=270"}],"version-history":[{"count":3,"href":"https:\/\/www.smart-rail.co.uk\/index.php?rest_route=\/wp\/v2\/posts\/270\/revisions"}],"predecessor-version":[{"id":272,"href":"https:\/\/www.smart-rail.co.uk\/index.php?rest_route=\/wp\/v2\/posts\/270\/revisions\/272"}],"wp:attachment":[{"href":"https:\/\/www.smart-rail.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=270"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.smart-rail.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=270"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.smart-rail.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=270"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}