{"id":2269,"date":"2021-01-12T20:06:02","date_gmt":"2021-01-12T20:06:02","guid":{"rendered":"http:\/\/www.smart-rail.co.uk\/?p=2269"},"modified":"2021-01-12T20:06:02","modified_gmt":"2021-01-12T20:06:02","slug":"northern-powerhouse-promises-will-be-delivered-grant-shapps","status":"publish","type":"post","link":"https:\/\/www.smart-rail.co.uk\/?p=2269","title":{"rendered":"&#8220;Northern Powerhouse promises will be delivered&#8221; \u2013 Grant Shapps"},"content":{"rendered":"\n<p>As we have seen promises being made, then quietly abandoned,\nthen re-announced several times over the years, we have become just a little\nbit cynical about whether the government intends to deliver on its past\ncommitments.<\/p>\n\n\n\n<p>The Transpennine Route Upgrade, announced in 2011 (and re-announced\nin 2012, 2015, 2017, 2019 &amp; 2020) is the classic example of this. <\/p>\n\n\n\n<p>Nearly 10 years after it was first announced, and two years after it was supposed to be complete and operational, most of it is still awaiting approval.<\/p>\n\n\n\n<p>We are yet to see the accelerated decision-making.<\/p>\n\n\n\n<p>Words are great (the late great Albus Dumbledore described them as our greatest source of magic), but it is actions that are needed.<\/p>\n\n\n\n<p>Part of article in the Yorkshire Post, 11th January 2021, by Grant Shapps, follows.  <br>Grant Shapps is the Transport Secretary and Northern Powerhouse Minister. <\/p>\n\n\n\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\"><p>As Cabinet Minister with responsibility for the Northern Powerhouse, I want to reassure readers that our commitment to levelling up the North remains undimmed. It is front and centre of our infrastructure plans.<\/p><\/blockquote>\n\n\n\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\"><p>In December, for example, I chaired the second full meeting of the Northern Transport Acceleration Council (NTAC).<\/p><\/blockquote>\n\n\n\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\"><p>The council has been created to unblock barriers and speed up delivery of transport projects.<\/p><\/blockquote>\n\n\n\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\"><p>Indeed, the list of transport schemes NTAC will consider is now clear, so the next task is to select the projects it will accelerate first.<\/p><\/blockquote>\n\n\n\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\"><p>A new platform has been unveiled at Leeds station after final work was completed over the festive period. Hundreds of workers gave up Christmas to work on overhead lines, tracks and signalling, and finish the project for the New Year.<\/p><\/blockquote>\n\n\n\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\"><p>The \u00a3161m Platform 0 will allow trains to enter and leave Leeds station much more easily, boosting capacity and punctuality.<\/p><\/blockquote>\n\n\n\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\"><p>While it won\u2019t come into full use until May \u2013 when the new timetable is introduced \u2013 it will be available for trains to use during times of disruption, minimising delays for passengers.<\/p><\/blockquote>\n\n\n\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\"><p>We\u2019ll soon be announcing a new bus strategy to improve journeys across the North, and provide communities with services that meet their specific needs.<\/p><\/blockquote>\n\n\n\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\"><p>We\u2019ll be moving forward with major infrastructure schemes like the Trans-Pennine rail upgrade and HS2, and with our long-term \u00a34.2bn Intracity Fund, which will deliver huge benefits for urban transport in the North.<\/p><\/blockquote>\n\n\n\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\"><p>We\u2019ll be working to restore passenger services on the Northumberland Line for the first time since 1964, when they fell victim to the Beeching cuts.<\/p><\/blockquote>\n\n\n\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\"><p>And we\u2019ll continue pressing ahead with an ambitious Northern roads programme, tackling congestion and transforming capacity on key routes like the A19 and A66.<\/p><\/blockquote>\n\n\n\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\"><p>That means delivering on one of the fundamental pledges in our manifesto: making the Northern Powerhouse an industrious, inventive and vibrant reality.<\/p><\/blockquote>\n\n\n\n<p><a href=\"https:\/\/www.yorkshirepost.co.uk\/news\/opinion\/columnists\/northern-powerhouse-promises-will-be-delivered-grant-shapps-3091436\">https:\/\/www.yorkshirepost.co.uk\/news\/opinion\/columnists\/northern-powerhouse-promises-will-be-delivered-grant-shapps-3091436<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>As we have seen promises being made, then quietly abandoned, then re-announced several times over the years, we have become just a little bit cynical about whether the government intends to deliver on its past commitments. The Transpennine Route Upgrade, &hellip; <a href=\"https:\/\/www.smart-rail.co.uk\/?p=2269\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[60,77],"tags":[26,78],"class_list":["post-2269","post","type-post","status-publish","format-standard","hentry","category-electrification","category-transpennine-route-upgrade","tag-electrification","tag-transpennine-route-upgrade"],"_links":{"self":[{"href":"https:\/\/www.smart-rail.co.uk\/index.php?rest_route=\/wp\/v2\/posts\/2269","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.smart-rail.co.uk\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.smart-rail.co.uk\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.smart-rail.co.uk\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.smart-rail.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=2269"}],"version-history":[{"count":1,"href":"https:\/\/www.smart-rail.co.uk\/index.php?rest_route=\/wp\/v2\/posts\/2269\/revisions"}],"predecessor-version":[{"id":2270,"href":"https:\/\/www.smart-rail.co.uk\/index.php?rest_route=\/wp\/v2\/posts\/2269\/revisions\/2270"}],"wp:attachment":[{"href":"https:\/\/www.smart-rail.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=2269"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.smart-rail.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=2269"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.smart-rail.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=2269"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}