{"id":2054,"date":"2020-01-09T21:01:45","date_gmt":"2020-01-09T21:01:45","guid":{"rendered":"http:\/\/www.smart-rail.co.uk\/?p=2054"},"modified":"2020-01-09T21:01:45","modified_gmt":"2020-01-09T21:01:45","slug":"this-is-why-stripping-northern-of-its-franchise-wouldnt-solve-yorkshires-rail-issues","status":"publish","type":"post","link":"https:\/\/www.smart-rail.co.uk\/?p=2054","title":{"rendered":"&#8220;This is why stripping Northern of its franchise wouldn&#8217;t solve Yorkshire&#8217;s rail issues&#8221;"},"content":{"rendered":"\n<p>[from the Yorkshire Post, Friday 3 January 2020]<\/p>\n\n\n\n<p>Delays, cancellations, old trains, staff shortages, strikes\nand bungled timetable chaos.<\/p>\n\n\n\n<p>Northern has seen it all in the three years since Arriva\ntook over the franchise from previous operators Serco-Abellio, who ran it under\nthe Northern Rail brand.<\/p>\n\n\n\n<p>Now rail industry sources claim that Northern could be\nstripped of its operating rights as early as March 31 under government plans.<\/p>\n\n\n\n<p>Although the Department for Transport has not confirmed that\nNorthern could cease running trains in the spring of 2020, transport secretary\nGrant Shapps has admitted that his ministers are considering the feasibility of\nre-nationalising the Northern network.<\/p>\n\n\n\n<p>The sources have claimed that bringing Northern routes under\npublic ownership would also mean splitting the franchise area into two regions,\nNorth West and North East, which would be run independently of each other.\nHowever, the DfT said they were still considering other options, such as a\nfresh short-term agreement with Northern until the franchise could be\nre-awarded. <\/p>\n\n\n\n<p>But just why has Northern struggled to run an efficient\nrailway? The operator claims that not all of the issues that have beset the\nregion&#8217;s commuter and rural services are its own fault &#8211; asserting that delays\nto major infrastructure upgrades, such as electrification, have been the root\ncause of many of its problems. They say the continued reliance on diesel has\nhad a knock-on effect on performance, causing train shortages and requiring the\nretention of older stock such as the hated Pacers.<\/p>\n\n\n\n<p>Here we examine the major reasons for the failure of the\nfranchise.<\/p>\n\n\n\n<p><strong>Old trains<\/strong><\/p>\n\n\n\n<p>The last major renewal of rolling stock used on what are now\nNorthern&#8217;s lines was in the 1980s, when British Rail still ran the national\nnetwork. This is when the Pacers &#8211; converted buses intended as a temporary\nstopgap &#8211; were introduced. Now they are only just being retired, and on some\nroutes will continue in service into 2020.<\/p>\n\n\n\n<p>Northern have received some other, newer trains during the\npast 40 years, but there hasn&#8217;t been a mass upgrade of the scale that will now\nhappen when the Pacers are replaced with new stock. The new diesel Class 195s\nand electric Class 331s were introduced last summer, the first new trains to be\nput into Northern service since 2000.<\/p>\n\n\n\n<p>The old fleet requires extensive maintenance &#8211; breakdowns\nare common and trains needing repairs pose timetabling issues. <\/p>\n\n\n\n<p>Between 2004 and 2016, the franchise was run by\nSerco-Abellio (under Northern Rail) on a no-growth contract. This meant that\nthere was no incentive to invest in new trains and revenue beyond a certain\nthreshold had to be returned to the government. It&#8217;s thought that this was\nbecause the franchise wasn&#8217;t expected to succeed &#8211; but it actually saw large\npassenger increases during the Northern Rail period, leading to a strain on\nresources.<\/p>\n\n\n\n<p><strong>Delays to electrification<\/strong><\/p>\n\n\n\n<p>Northern attribute the failure of the state to electrify the\nmajority of their network as being a key cause of the franchise&#8217;s woes.\nEssentially, it has left them relying on an ageing diesel fleet during a period\nwhere there were fewer new diesels being built.<\/p>\n\n\n\n<p>In 2009, it was predicted that all of the north&#8217;s arterial\nlines would be electrified in 25 years. But work has been well behind schedule,\nand for many routes has been postponed indefinitely.<\/p>\n\n\n\n<p>This has meant that the Pacers had to stay, as newer\nelectric trains couldn&#8217;t serve most of Northern&#8217;s network. Northern struggled\nto lease more diesel units from elsewhere in the UK; during the Tour de France\nGrand Depart in 2014, when they wished to run extra services for cycling fans,\nthey chartered in spare diesels from other operators but still couldn&#8217;t meet\ndemand. <\/p>\n\n\n\n<p>Now, many operators are placing orders for new &#8216;hybrid&#8217;\ntrains that can run on both wired and non-electrified routes, such as LNER&#8217;s\nAzumas &#8211; but for most of the past decade, there was no incentive to invest in\ndiesel.<\/p>\n\n\n\n<p>Former signalman Adrian Caltieri, who is now a tutor at the Institute of Railway Operators, says that the Leeds-Harrogate route was one of the victims of this failure to deliver: <\/p>\n\n\n\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\"><p>&#8220;The late completion (by over two years) of electrification of the Manchester-Bolton-Preston route is the responsibility of Network Rail. This required the continued use of diesel trains which should have been used to strengthen services elsewhere on its non-electrified routes, including Leeds-Harrogate.&#8221;<\/p><\/blockquote>\n\n\n\n<p><strong>Driver shortages<\/strong><\/p>\n\n\n\n<p>Staffing has been a constant thorn in the side of both\nNorthern and its predecessors. Driver retention has suffered as freight\ncompanies have poached trained staff. Although passenger train drivers often\nearn more than their counterparts in the freight sector, staffing levels still\nhaven&#8217;t fully recovered. Rest day working became common and the industry is now\nmore reliant on overtime to fill rosters. Sunday services have been\nparticularly badly affected.<\/p>\n\n\n\n<p>There have also been high-profile issues with staff\nsickness. On Christmas Eve, Northern had to cancel numerous trains due to\n&#8216;unprecedented&#8217; levels of absence.<\/p>\n\n\n\n<p>Rail planning and operations consultant William Barter explains: <\/p>\n\n\n\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\"><p>&#8220;Historically railways always regarded Sunday as being outside the working week, and an extra day\u2019s work at overtime rates. You can imagine this was quite popular with the staff! But overtime is voluntary, so if someone declares they don\u2019t want to work a particular Sunday you can\u2019t make them, and if everyone declares that, you have a problem.<\/p><\/blockquote>\n\n\n\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\"><p>&#8220;Maybe it didn\u2019t matter too much in the days when Sunday services were very sparse and not many staff needed, so that turning down a Sunday was no big deal. Most franchises have now negotiated what used to be known as continental rostering, which covers the whole week as part of the contracted roster, but a few hang on, including a couple in the south, so it is not just a Northern problem.&#8221;<\/p><\/blockquote>\n\n\n\n<p><strong>Timetable chaos in 2018<\/strong><\/p>\n\n\n\n<p>The first of Northern&#8217;s major timetable revisions occurred\nin May 2018. It resulted in widespread delays and cancellations, and Northern\nthen announced that they were taking part in an independent inquiry into the\nfiasco ahead of their next timetable change, which was planned for December of\nthe same year.<\/p>\n\n\n\n<p>An emergency timetable had to be introduced in June, but\nthis didn&#8217;t solve all of the issues. <\/p>\n\n\n\n<p>Northern blamed Network Rail and, again, delays to\nelectrification for the issues. They had only informed train operators in\nJanuary that that electrification of the Blackpool-Preston route wouldn&#8217;t be\nfinished until November, but Northern had already completed driver training\nwith the planned electric trains. They had expected to be able to use the new trains\nby May and were then forced to draft a new timetable that still depended on\ndiesel. Many drivers were not trained to handle the existing rolling stock in\ntime. <\/p>\n\n\n\n<p>The December timetable included only minor changes, and\nsignificant alterations weren&#8217;t expected until May 2019, when the new rolling\nstock was expected to have arrived.<\/p>\n\n\n\n<p>In May 2019, some new services were introduced &#8211; the Chester\nto Leeds express under the Northern Connect branding, and an hourly Hull to\nScarborough departure which doubled the frequency on the section between\nBridlington and Scarborough. But other improvements could not be implemented\nwithout having an adverse effect on existing trains.<\/p>\n\n\n\n<p>A month later, the government-managed Operator of Last\nResort opened &#8216;due diligence&#8217; proceedings, reviewing the performance of the\nfranchise.<\/p>\n\n\n\n<p>During the tumultuous spring of 2018, the number of Northern trains arriving on time dropped from 94 to 57 per cent in just two months.<\/p>\n\n\n\n<p>William Barter asserts that the lack of electrification left Northern in an untenable position: <\/p>\n\n\n\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\"><p>&#8220;The timetable issues of May 2018 were of course a disaster. The root problem was that electrification had not been completed, but other franchises\u2019 service improvements were dependent on the diesel rolling stock being released from Northern.<\/p><\/blockquote>\n\n\n\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\"><p>&#8220;Frankly, it\u2019s a no-brainer that if you haven\u2019t got the railway, you can\u2019t run the service, so the only possible solution would have been to postpone the whole timetable change, including the various improvements elsewhere. This would have need someone somewhere, which can only be the DfT, to compensate the operators who would not be able to implement their changes. It\u2019s not the sort of thing the various industry players could agree on themselves by \u2018collaboration\u2019, as it\u2019s not a case compromise, but clear losers with no benefit.&#8221;<\/p><\/blockquote>\n\n\n\n<p>Adrian Caltieri adds: <\/p>\n\n\n\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\"><p>&#8220;The timetable on the Liverpool-Manchester-Leeds-York-Newcastle-Edinburgh route has too many trains for the infrastructure to deliver reliably. The mix of stopping and fast services on this route with very limited overtaking possibilities results in any late running by one train impacting on many others. This then affects Northern services around Leeds and York.&#8221;<\/p><\/blockquote>\n\n\n\n<p><strong>Strikes<\/strong><\/p>\n\n\n\n<p>Northern has been crippled by industrial action and an\nimpasse in relations between the company and the RMT union, which represents\nrail staff.<\/p>\n\n\n\n<p>The dispute originated over the role of train guards, which\nNorthern could potentially make redundant as changes in technology reduce their\nnecessity.<\/p>\n\n\n\n<p>DfT targets are for half of future services to be controlled\nonly by the driver, with no need for a conductor to be on board. The guards\ncurrently open the doors and ensure passenger safety.<\/p>\n\n\n\n<p>Things came to a head at the end of 2018, when the RMT\noffered to suspend planned strikes in return for a guarantee that guards would\nremain, but on November 30 decided to continue with the walkouts.<\/p>\n\n\n\n<p>The saga did not come to an end until February 2019. By this\npoint, strikes had taken place every Saturday since late August 2018. The RMT\nare now satisfied that guards will be protected under the current franchise\nagreement.<\/p>\n\n\n\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\"><p>&#8220;The ongoing dispute over driver controlled operation is basically one of maintaining industrial strength,&#8221; says Adrian Caltieri.<\/p><\/blockquote>\n\n\n\n<p><strong>East v West<\/strong><\/p>\n\n\n\n<p>Before franchises were re-organised in 2004, Northern&#8217;s\npresent-day network was actually two completely separate franchises. First\nNorth Western were the last company to run North West Regional Railways, and\nArriva Trains Northern ran Regional Railways North East. Manchester was\nessentially the dividing line between the two. The post-2000 organisation\nplaced the express inter-city services into a Transpennine franchise and the\nrural and commuter lines into a Northern one &#8211; initially awarded to\nSerco-Abellio.<\/p>\n\n\n\n<p>However, the historic divide between east and west has\ncreated a legacy of problems that still exist today. Many long-serving drivers\nand staff transferred over to Northern Rail in 2004 and remain with Northern\ntoday, but their pay and working conditions have been inherited from their\nprevious employers.<\/p>\n\n\n\n<p>Under a legacy trade union agreement, &#8216;west&#8217; drivers &#8211; who\nused to work for First North Western &#8211; aren&#8217;t required to work Sundays, but\nthose in the &#8216;east&#8217; area are. This is why many of Northern&#8217;s services running\nin and out of Manchester are cancelled on Sundays.<\/p>\n\n\n\n<p>William Barter doesn&#8217;t believe splitting the franchise once\nagain would lead to an improved service.<\/p>\n\n\n\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\"><p>&#8220;As I recall, Northern was created as one franchise because cross-boundary services were felt to be at risk or overlooked when there were NW and NE franchises. So splitting it up would just reintroduce those problems.<\/p><\/blockquote>\n\n\n\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\"><p>&#8220;When the Northern franchise was created, its two components had different staff agreements, and these were never revised as inevitably there would have been a \u2018levelling up\u2019 and thus a cost.&#8221;<\/p><\/blockquote>\n\n\n\n<p><strong>An ambitious blueprint<\/strong><\/p>\n\n\n\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\"><p>&#8220;It&#8217;s a complicated network with many varied and nuanced problems. Part of the problem comes from the deal that Arriva and the DfT both signed. The DfT accepted a deal that was too good to be true and was always going to be very difficult to deliver,&#8221; says rail journalist and writer Philip Haigh.<\/p><\/blockquote>\n\n\n\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\"><p>&#8220;The DfT asked for half of the services to become driver-only, but Arriva said they would aim for 100 per cent under the new method, which was the cause of the strikes. That was a laudable ambition but never realistic &#8211; it would be like writing 5,000 words in 30 minutes.<\/p><\/blockquote>\n\n\n\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\"><p>&#8220;Another more subtle aspect is that the bid was put together by Arriva and then handed to Northern staff to implement &#8211; the staff had transferred over from the previous franchise and had to make someone else&#8217;s plan work. They were aghast and the MD, Alex Hynes, left soon after. He might have stayed if it had been deliverable.<\/p><\/blockquote>\n\n\n\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\"><p>&#8220;Northern need to take their share of the criticism as they put forward a hugely optimistic plan. However, the new trains have been late to arrive from the manufacturer and the May 2018 meltdown was caused by late electrification, which had a ripple effect.&#8221;<\/p><\/blockquote>\n\n\n\n<p>Adrian Caltieri concurs: <\/p>\n\n\n\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\"><p>&#8220;There is a lack of understanding from the public that the government controls investment and also most train fares.<\/p><\/blockquote>\n\n\n\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\"><p>&#8220;Having said that, Northern could definitely have managed customer relations, expectations and its reputation in a far better way.&#8221;<\/p><\/blockquote>\n\n\n\n<p><strong>What happens next?<\/strong><\/p>\n\n\n\n<p>There are three main options: nationalisation under the\nOperator of Last Resort, an interim agreement with Northern, or eventual\nre-tendering of the franchise. In future, it&#8217;s possible that the franchise\nsystem may be scrapped completely.<\/p>\n\n\n\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\"><p>&#8220;If the franchise did end up being nationalised, the DfT might be willing to make some tough decisions that they didn&#8217;t permit Northern to make. From talking to LNER senior managers since the government took them over, they say the DfT now treats them as &#8216;one of us&#8217; rather than the &#8216;enemy&#8217;,&#8221; says Philip Haigh.<\/p><\/blockquote>\n\n\n\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\"><p>&#8220;They won&#8217;t allow Northern to make key changes to the timetable in the Manchester region, where there are more trains than the lines can cope with. There would need to be cuts to the timetable but this would have a knock-on effect in Yorkshire. Arriva would feel aggrieved if their ideas that the DfT had rejected were then implemented.<\/p><\/blockquote>\n\n\n\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\"><p>&#8220;I&#8217;m not sure about another east-west split &#8211; what would it solve? You would end up with two people on an MD&#8217;s salary and two head offices, it would not be efficient. People inside the company would be worrying about their jobs and they would start looking inwards and being more concerned about themselves rather than passengers.<\/p><\/blockquote>\n\n\n\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\"><p>&#8220;Whoever takes on the franchise next needs to lay out a very clear plan for how they can improve the situation. They need to be very public about it and take passengers with them. They need to convince them with openness and honesty &#8211; that can go a long way. Passengers are hugely upset about overcrowding and cancellations and that is magnified because there is no sense that things will ever get better.<\/p><\/blockquote>\n\n\n\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\"><p>&#8220;It bewilders me why anyone would bid for a franchise at the moment &#8211; there are no successful ones. If Arriva are allowed to keep Northern under a different arrangement, that to me would say that the DfT are accepting some responsibility for the situation. <\/p><\/blockquote>\n\n\n\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\"><p>&#8220;My money is on an Office for Last Resort takeover, which would imply that the DfT is blaming Arriva.<\/p><\/blockquote>\n\n\n\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\"><p>&#8220;There is a big review of the franchising system going on at the moment and the model is up in the air &#8211; it may not even continue. If not, the alternatives would be nationalisation or the concession model. This would mean that local councils would run local lines on a system of tight control. All the money earned would go back to the government or the councils, and the operator is paid a fee to run a service.<\/p><\/blockquote>\n\n\n\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\"><p>&#8220;This could see metro mayor areas like Manchester take over trains and could trigger the east-west split again. But politicians across the north still bicker and want to run their own little empires! The network doesn&#8217;t always lend itself to that.&#8221;<\/p><\/blockquote>\n\n\n\n<p><a href=\"https:\/\/www.yorkshirepost.co.uk\/news\/people\/this-is-why-stripping-northern-of-its-franchise-wouldn-t-solve-yorkshire-s-rail-issues-1-10182110\">https:\/\/www.yorkshirepost.co.uk\/news\/people\/this-is-why-stripping-northern-of-its-franchise-wouldn-t-solve-yorkshire-s-rail-issues-1-10182110<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>[from the Yorkshire Post, Friday 3 January 2020] Delays, cancellations, old trains, staff shortages, strikes and bungled timetable chaos. Northern has seen it all in the three years since Arriva took over the franchise from previous operators Serco-Abellio, who ran &hellip; <a href=\"https:\/\/www.smart-rail.co.uk\/?p=2054\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[5],"tags":[57],"class_list":["post-2054","post","type-post","status-publish","format-standard","hentry","category-northern-rail","tag-northern-rail"],"_links":{"self":[{"href":"https:\/\/www.smart-rail.co.uk\/index.php?rest_route=\/wp\/v2\/posts\/2054","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.smart-rail.co.uk\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.smart-rail.co.uk\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.smart-rail.co.uk\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.smart-rail.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=2054"}],"version-history":[{"count":1,"href":"https:\/\/www.smart-rail.co.uk\/index.php?rest_route=\/wp\/v2\/posts\/2054\/revisions"}],"predecessor-version":[{"id":2055,"href":"https:\/\/www.smart-rail.co.uk\/index.php?rest_route=\/wp\/v2\/posts\/2054\/revisions\/2055"}],"wp:attachment":[{"href":"https:\/\/www.smart-rail.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=2054"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.smart-rail.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=2054"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.smart-rail.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=2054"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}