{"id":1729,"date":"2018-08-07T16:08:56","date_gmt":"2018-08-07T15:08:56","guid":{"rendered":"http:\/\/www.smart-rail.co.uk\/?p=1729"},"modified":"2018-08-07T16:27:41","modified_gmt":"2018-08-07T15:27:41","slug":"looking-to-the-future-improving-the-timetable","status":"publish","type":"post","link":"https:\/\/www.smart-rail.co.uk\/?p=1729","title":{"rendered":"Looking to the future &#8211; improving the timetable"},"content":{"rendered":"<p><a href=\"https:\/\/www.smart-rail.co.uk\/wp-content\/uploads\/2018\/08\/TfN-logo.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-1731\" src=\"https:\/\/www.smart-rail.co.uk\/wp-content\/uploads\/2018\/08\/TfN-logo.jpg\" alt=\"\" width=\"474\" height=\"140\" srcset=\"https:\/\/www.smart-rail.co.uk\/wp-content\/uploads\/2018\/08\/TfN-logo.jpg 474w, https:\/\/www.smart-rail.co.uk\/wp-content\/uploads\/2018\/08\/TfN-logo-300x89.jpg 300w\" sizes=\"auto, (max-width: 474px) 100vw, 474px\" \/><\/a>Whilst all the focus at the moment is on the failure to operate a service which resembles the published new timetable , with its large number of cancellations, part-cancellations and poor punctuality, there&#8217;s still a need to look beyond the day-to-day issues.<\/p>\n<p>SMART&#8217;s objective remains a daytime service of two trains per hour, with additional services at peak times. Whilst that may be difficult to achieve before the Transpennine Route Upgrade (whatever that may contain) is carried out, that doesn&#8217;t mean that nothing can be done.<\/p>\n<p>Transport for the North (TfN) have recognised the issues with the timetable at Slaithwaite, Marsden, Greenfield and Mossley, and it&#8217;s one of the things they are looking at with a view to making changes to provide us with a more coherent and more frequent service.<\/p>\n<p>It&#8217;s identified in the agenda for the TfN Rail North Committee Meeting on 12th July. Item 6, appendix 1, workstream 2 refers.<\/p>\n<blockquote><p><b>Develop train service mitigations and improvements to\u00a0<\/b><b>ensure an improved service across all routes<\/b><br \/>\nAs further mitigation for the ongoing disruption of rail services, TfN could seek improvements over and above those contracted through the Franchise Agreements. Several areas have been identified with the franchisees\u2019 plans that create issues for connectivity and capacity:<br \/>\n\u2022 Preston to Manchester via Bolton (electrification due later in the year)<br \/>\n\u2022 Manchester to Leeds (issues with calling pattern at local stations)<br \/>\n\u2022 Warrington to Manchester (re-routing of TPE service from May 2018)<br \/>\n\u2022 Southport to Manchester (desire to revert to more services to Piccadilly)<br \/>\nTfN will assess the franchisees\u2019 delivery plans and may wish to procure additional services or rolling stock. There is scope to utilise funds already secured through the franchise (such as innovation funds and other sources) subject to business case.<br \/>\n<b>Who will lead?<\/b><br \/>\nTfN and DfT, working through the Rail North Partnership.<br \/>\n<b>Desired Outcome<\/b><br \/>\nImproved connectivity and capacity.<\/p><\/blockquote>\n<p>link is\u00a0<a href=\"https:\/\/transportforthenorth.com\/wp-content\/uploads\/Item-6-RNC-120718-Work-Plan-.pdf\">https:\/\/transportforthenorth.com\/wp-content\/uploads\/Item-6-RNC-120718-Work-Plan-.pdf<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Whilst all the focus at the moment is on the failure to operate a service which resembles the published new timetable , with its large number of cancellations, part-cancellations and poor punctuality, there&#8217;s still a need to look beyond the &hellip; <a href=\"https:\/\/www.smart-rail.co.uk\/?p=1729\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[59,11,58,75],"tags":[8,56,32,76],"class_list":["post-1729","post","type-post","status-publish","format-standard","hentry","category-marsden","category-new-rail-services","category-slaithwaite","category-tfn","tag-marsden","tag-new-rail-services","tag-slaithwaite","tag-tfn"],"_links":{"self":[{"href":"https:\/\/www.smart-rail.co.uk\/index.php?rest_route=\/wp\/v2\/posts\/1729","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.smart-rail.co.uk\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.smart-rail.co.uk\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.smart-rail.co.uk\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.smart-rail.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=1729"}],"version-history":[{"count":2,"href":"https:\/\/www.smart-rail.co.uk\/index.php?rest_route=\/wp\/v2\/posts\/1729\/revisions"}],"predecessor-version":[{"id":1732,"href":"https:\/\/www.smart-rail.co.uk\/index.php?rest_route=\/wp\/v2\/posts\/1729\/revisions\/1732"}],"wp:attachment":[{"href":"https:\/\/www.smart-rail.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=1729"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.smart-rail.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=1729"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.smart-rail.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=1729"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}