{"id":1645,"date":"2018-05-29T18:47:01","date_gmt":"2018-05-29T17:47:01","guid":{"rendered":"http:\/\/www.smart-rail.co.uk\/?p=1645"},"modified":"2018-05-29T18:47:01","modified_gmt":"2018-05-29T17:47:01","slug":"new-timetable-ten-days-in","status":"publish","type":"post","link":"https:\/\/www.smart-rail.co.uk\/?p=1645","title":{"rendered":"New Timetable, ten days in"},"content":{"rendered":"<p>So, ten days of the new timetable, and it was to be hoped that it would have settled down by now, and that TPE and Northern would be operating a service similar to the one in the published timetable.<\/p>\n<p>It seems even that, modest as it is, was too much to expect. There has yet to be a single day without multiple cancellations, of both TPEs and Northern&#8217;s services.<\/p>\n<p>Northern&#8217;s problems have been well-documented, though the determination of both Arriva Northern and the Department for Transport to blame everyone but themselves doesn&#8217;t inspire confidence in the commitment (and still less the ability) to fix the problems which they both had a large share in creating.<\/p>\n<p>TPE have not dealt with this well, either. Whilst not all the problems have been of their making &#8211; Northern&#8217;s driver shortage leaving trains with no drivers clogging up the platforms at Victoria is not something within TPEs control, for example &#8211; they have not adapted well to disruption.<\/p>\n<p>It is not acceptable to leave passengers stranded in Stalybridge by cancelling the last leg of a train to Manchester, nor to render the return service close to useless by starting it at Stalybridge not Manchester.<\/p>\n<p>It is not acceptable to miss out stops at Mossley, Greenfield, Marsden and Slaithwaite to make up time on late running services.<\/p>\n<p>It is not acceptable to run a skeleton service on the morning peak into Manchester, with the timings bearing minimal resemblance to the published timetable.<\/p>\n<p>It is not acceptable to create three hour gaps in the service.<\/p>\n<p>It is not acceptable that passengers in the Leeds direction in the peaks see delays of 5 to 10 minutes as good news, although it&#8217;s a lot better than Manchester-bound passengers are experiencing.<\/p>\n<p>We cannot remember a week this bad since the unlamented First North Western were franchisees, in the late 1990s.<\/p>\n<p>How and when does this get solved? SMART are just a bunch of passengers, and we don&#8217;t have the answer. The worrying thing is that no-one in the railway industry seems to have an answer either.<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>So, ten days of the new timetable, and it was to be hoped that it would have settled down by now, and that TPE and Northern would be operating a service similar to the one in the published timetable. It &hellip; <a href=\"https:\/\/www.smart-rail.co.uk\/?p=1645\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[59,5,58,53,18],"tags":[8,57,32,24,62],"class_list":["post-1645","post","type-post","status-publish","format-standard","hentry","category-marsden","category-northern-rail","category-slaithwaite","category-timetable-changes-2","category-tpe-services","tag-marsden","tag-northern-rail","tag-slaithwaite","tag-timetable-changes","tag-tpe-services"],"_links":{"self":[{"href":"https:\/\/www.smart-rail.co.uk\/index.php?rest_route=\/wp\/v2\/posts\/1645","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.smart-rail.co.uk\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.smart-rail.co.uk\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.smart-rail.co.uk\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.smart-rail.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=1645"}],"version-history":[{"count":2,"href":"https:\/\/www.smart-rail.co.uk\/index.php?rest_route=\/wp\/v2\/posts\/1645\/revisions"}],"predecessor-version":[{"id":1647,"href":"https:\/\/www.smart-rail.co.uk\/index.php?rest_route=\/wp\/v2\/posts\/1645\/revisions\/1647"}],"wp:attachment":[{"href":"https:\/\/www.smart-rail.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=1645"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.smart-rail.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=1645"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.smart-rail.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=1645"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}