{"id":1577,"date":"2018-04-04T19:55:36","date_gmt":"2018-04-04T18:55:36","guid":{"rendered":"http:\/\/www.smart-rail.co.uk\/?p=1577"},"modified":"2018-04-04T19:55:36","modified_gmt":"2018-04-04T18:55:36","slug":"engineering-works-sunday-8th-april","status":"publish","type":"post","link":"https:\/\/www.smart-rail.co.uk\/?p=1577","title":{"rendered":"Engineering Works, Sunday 8th April"},"content":{"rendered":"<p>Manchester Victoria station will be closed for engineering works on Sunday 8th April. Trains will run between Huddersfield and Stalybridge, with then a choice of replacement bus to Victoria or connecting train between Stalybridge &amp; Piccadilly.<\/p>\n<p>Link to timetable is here<\/p>\n<p><a href=\"https:\/\/be803fe5c416e39d38ae-aa21086260d3bd4e072d597fe09c2e80.ssl.cf3.rackcdn.com\/images\/timetables\/2018-04\/week-02\/w0204a-Huddersfield---Manchester-Victoria.pdf\">https:\/\/be803fe5c416e39d38ae-aa21086260d3bd4e072d597fe09c2e80.ssl.cf3.rackcdn.com\/images\/timetables\/2018-04\/week-02\/w0204a-Huddersfield&#8212;Manchester-Victoria.pdf<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Manchester Victoria station will be closed for engineering works on Sunday 8th April. Trains will run between Huddersfield and Stalybridge, with then a choice of replacement bus to Victoria or connecting train between Stalybridge &amp; Piccadilly. Link to timetable is &hellip; <a href=\"https:\/\/www.smart-rail.co.uk\/?p=1577\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[59,47,5,58,51],"tags":[8,66,57,32,38],"class_list":["post-1577","post","type-post","status-publish","format-standard","hentry","category-marsden","category-northern-hub","category-northern-rail","category-slaithwaite","category-weekend-rail-services","tag-marsden","tag-northern-hub","tag-northern-rail","tag-slaithwaite","tag-week-end-rail-services"],"_links":{"self":[{"href":"https:\/\/www.smart-rail.co.uk\/index.php?rest_route=\/wp\/v2\/posts\/1577","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.smart-rail.co.uk\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.smart-rail.co.uk\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.smart-rail.co.uk\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.smart-rail.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=1577"}],"version-history":[{"count":1,"href":"https:\/\/www.smart-rail.co.uk\/index.php?rest_route=\/wp\/v2\/posts\/1577\/revisions"}],"predecessor-version":[{"id":1578,"href":"https:\/\/www.smart-rail.co.uk\/index.php?rest_route=\/wp\/v2\/posts\/1577\/revisions\/1578"}],"wp:attachment":[{"href":"https:\/\/www.smart-rail.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=1577"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.smart-rail.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=1577"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.smart-rail.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=1577"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}