{"id":1566,"date":"2018-03-29T13:22:21","date_gmt":"2018-03-29T12:22:21","guid":{"rendered":"http:\/\/www.smart-rail.co.uk\/?p=1566"},"modified":"2018-03-29T13:22:21","modified_gmt":"2018-03-29T12:22:21","slug":"engineering-work-friday-30-march-monday-2-april","status":"publish","type":"post","link":"https:\/\/www.smart-rail.co.uk\/?p=1566","title":{"rendered":"Engineering Work, Friday 30 March &#8211; Monday 2 April"},"content":{"rendered":"<p>Manchester Victoria station will be closed for engineering works over Easter weekend. Trains will run between Huddersfield and Stalybridge (some continuing to\/from Ashton on Friday 30th), with then a choice of replacement bus to Victoria or connecting train between Stalybridge &amp; Piccadilly.<\/p>\n<p>It&#8217;s worth noting, since Northern haven&#8217;t highlighted it, that this affects passengers travelling between Marsden\/Slaithwaite &amp; Huddersfield. It will be a basic hourly service so the usual peak hour weekday extras between Marsden\/Slaithwaite &amp; Huddersfield will be withdrawn.<\/p>\n<p>Link to timetable is here<\/p>\n<p><a href=\"https:\/\/be803fe5c416e39d38ae-aa21086260d3bd4e072d597fe09c2e80.ssl.cf3.rackcdn.com\/images\/timetables\/2018-03\/GNRP-TT25-Manchester-Victoria-_E2_80_93-Stalybridge-_E2_80_93-Huddersfield.pdf\">https:\/\/be803fe5c416e39d38ae-aa21086260d3bd4e072d597fe09c2e80.ssl.cf3.rackcdn.com\/images\/timetables\/2018-03\/GNRP-TT25-Manchester-Victoria-_E2_80_93-Stalybridge-_E2_80_93-Huddersfield.pdf<\/a><\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Manchester Victoria station will be closed for engineering works over Easter weekend. Trains will run between Huddersfield and Stalybridge (some continuing to\/from Ashton on Friday 30th), with then a choice of replacement bus to Victoria or connecting train between Stalybridge &hellip; <a href=\"https:\/\/www.smart-rail.co.uk\/?p=1566\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[59,5,58,51],"tags":[8,57,32,38],"class_list":["post-1566","post","type-post","status-publish","format-standard","hentry","category-marsden","category-northern-rail","category-slaithwaite","category-weekend-rail-services","tag-marsden","tag-northern-rail","tag-slaithwaite","tag-week-end-rail-services"],"_links":{"self":[{"href":"https:\/\/www.smart-rail.co.uk\/index.php?rest_route=\/wp\/v2\/posts\/1566","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.smart-rail.co.uk\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.smart-rail.co.uk\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.smart-rail.co.uk\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.smart-rail.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=1566"}],"version-history":[{"count":1,"href":"https:\/\/www.smart-rail.co.uk\/index.php?rest_route=\/wp\/v2\/posts\/1566\/revisions"}],"predecessor-version":[{"id":1567,"href":"https:\/\/www.smart-rail.co.uk\/index.php?rest_route=\/wp\/v2\/posts\/1566\/revisions\/1567"}],"wp:attachment":[{"href":"https:\/\/www.smart-rail.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=1566"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.smart-rail.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=1566"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.smart-rail.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=1566"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}