{"id":1280,"date":"2015-03-06T14:47:03","date_gmt":"2015-03-06T14:47:03","guid":{"rendered":"http:\/\/www.smart-rail.co.uk\/?p=1280"},"modified":"2015-03-06T14:56:30","modified_gmt":"2015-03-06T14:56:30","slug":"engineering-works-sundays-8th-15th-22nd-march-2015","status":"publish","type":"post","link":"https:\/\/www.smart-rail.co.uk\/?p=1280","title":{"rendered":"Engineering works, Sundays 8th, 15th &#038; 22nd March 2015"},"content":{"rendered":"<p>Buses replace trains between Manchester Victoria and Stalybridge for the next 3 Sundays (8th, 15th &amp; 22nd March).<\/p>\n<p>A revised timetable will be in operation with trains running between Huddersfield and Stalybridge only.<\/p>\n<p>Although the timetable shows connecting buses at Stalybridge, it may be quicker and more convenient to change on to an express to Piccadilly (5 minute connection towards Manchester, 3 to 5 minute connection coming from Manchester).<br \/>\nhttp:\/\/www.northernrail.org\/pdfs\/trackworks\/5005a_HUD-MCV.pdf<\/p>\n<p><a href=\"https:\/\/www.smart-rail.co.uk\/wp-content\/uploads\/2015\/03\/5005a_HUD-MCV.pdf\">5005a_HUD-MCV<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Buses replace trains between Manchester Victoria and Stalybridge for the next 3 Sundays (8th, 15th &amp; 22nd March). A revised timetable will be in operation with trains running between Huddersfield and Stalybridge only. Although the timetable shows connecting buses at &hellip; <a href=\"https:\/\/www.smart-rail.co.uk\/?p=1280\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[51],"tags":[38],"class_list":["post-1280","post","type-post","status-publish","format-standard","hentry","category-weekend-rail-services","tag-week-end-rail-services"],"_links":{"self":[{"href":"https:\/\/www.smart-rail.co.uk\/index.php?rest_route=\/wp\/v2\/posts\/1280","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.smart-rail.co.uk\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.smart-rail.co.uk\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.smart-rail.co.uk\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.smart-rail.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=1280"}],"version-history":[{"count":1,"href":"https:\/\/www.smart-rail.co.uk\/index.php?rest_route=\/wp\/v2\/posts\/1280\/revisions"}],"predecessor-version":[{"id":1282,"href":"https:\/\/www.smart-rail.co.uk\/index.php?rest_route=\/wp\/v2\/posts\/1280\/revisions\/1282"}],"wp:attachment":[{"href":"https:\/\/www.smart-rail.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=1280"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.smart-rail.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=1280"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.smart-rail.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=1280"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}